📢 Gate廣場 #MBG任务挑战# 發帖贏大獎活動火熱開啓!
想要瓜分1,000枚MBG?現在就來參與,展示你的洞察與實操,成爲MBG推廣達人!
💰️ 本期將評選出20位優質發帖用戶,每人可輕鬆獲得50枚MBG!
如何參與:
1️⃣ 調研MBG項目
對MBG的基本面、社區治理、發展目標、代幣經濟模型等方面進行研究,分享你對項目的深度研究。
2️⃣ 參與並分享真實體驗
參與MBG相關活動(包括CandyDrop、Launchpool或現貨交易),並曬出你的參與截圖、收益圖或實用教程。可以是收益展示、簡明易懂的新手攻略、小竅門,也可以是現貨行情點位分析,內容詳實優先。
3️⃣ 鼓勵帶新互動
如果你的帖子吸引到他人參與活動,或者有好友評論“已參與/已交易”,將大幅提升你的獲獎概率!
MBG熱門活動(帖文需附下列活動連結):
Gate第287期Launchpool:MBG — 質押ETH、MBG即可免費瓜分112,500 MBG,每小時領取獎勵!參與攻略見公告:https://www.gate.com/announcements/article/46230
Gate CandyDrop第55期:CandyDrop x MBG — 通過首次交易、交易MBG、邀請好友註冊交易即可分187,500 MBG!參與攻略見公告:https://www.gate.com/announcements
Bitcoin miner production falls in June on power curtailment, weather
Several Bitcoin mining firms reported lowered BTC production in June, mainly due to power curtailment in Texas.
Riot Platforms produced 450 Bitcoin (BTC) in the month, a 12% decline from May, when the firm mined 514 BTC, it stated in an announcement on Thursday.
Riot CEO Jason Les said the firm’s power strategy includes “economic curtailment” and voluntary participation in the Electric Reliability Council of Texas’s Four Coincident Peak (4CP) and other demand response programs
It “significantly contributes to grid stability while enhancing Riot’s competitive positioning,” he added
June marked the beginning of the ERCOT’s 4CP program, a tariff that captures demand charges in the market. It is designed to manage the periods of highest electricity demand during the months of June, July, August and September.
Large electricity consumers, such as Bitcoin miners, face transmission charges based on their usage during peak periods, so they can voluntarily curtail operations.
Riot also reported that it sold 397 BTC for $41.7 million and currently holds 19,273 Bitcoin.
Cipher Mining reported this week that it had produced 160 BTC in June, sold 58 BTC, and holds 1,063 Bitcoin
The company stated that its June production numbers were impacted by deliberate curtailment as part of their “proactive 4CP avoidance strategy.”
“This approach allowed the company to avoid costly 4CP penalties and maintain its position as having some of the lowest power costs in the industry,” it stated
Related: Bitcoin production costs up 9% on higher hashrate, energy prices
Cipher’s Black Pearl facility in Texas started contributing to production at the end of June, but the overall monthly production was reduced due to the strategic curtailment
MARA mining down 25%
MARA Holdings also reported a 25% reduction in production for June, with 211 Bitcoin mined compared to 282 the previous month. As of June 30, the company held a total of 49,940 BTC and did not sell any during the month
MARA CEO Fred Thiel said, “Following a record-breaking May, production in June came in lower, with 211 blocks won for the month.”
He blamed the decline on “reduced uptime from weather-related curtailment” and the temporary deployment of older machines in its Garden City, Texas, facility while storm-related damage was being repaired
“Natural variability in block luck — an expected dynamic when operating our own mining pool — also contributed,” he said
CleanSpark bucks the trend
Meanwhile, CleanSpark increased its Bitcoin production by 6.7% in June, surpassing its mid-year hashrate target of 20 exahashes per second (EH/s)
The firm produced 445 Bitcoin and only sold 8, bringing its total holdings to 6,591 Bitcoin as of the end of the month
Magazine: Bitcoin vs stablecoins showdown looms as GENIUS Act nears